WBG’s Design/Build – Mechanical Room Project
March 6, 2026
Behind every successful facility upgrade is a team that can turn challenges into solutions. At BD’s Sumter campus, WBG’s Design/Build Team headed by Shawn Wood worked in delivering a mechanical system built for performance and reliability.