Schattdecor

Lexington, South Carolina

,

The Challenge

As production demand increased, Schattdecor outgrew its original facility and acquired an additional building nearby to expand operations. The new space required a new mechanical infrastructure to support both the manufacturing processes & the environmental control.

Requirements included:

The Solution

Working directly with both Schattdecor and an engineering partner, Vista Engineering, WBG was an integral part of the new design and phased mechanical solutions to meet the facility’s operational needs.

Phase 1: Chiller Plant & Cooling Systems

The first phase focused on establishing a robust cooling infrastructure, including:

This approach allowed for efficient cooling without disrupting the integrity of the newly acquired facility.

Phase 2: Boiler Plant Installation

The second phase addressed process heating requirements with:

Controls & Integration

A Trane control system was installed to unify operations, providing management of the chiller plant and air rotation systems for improved efficiency & monitoring.

Additional Infrastructure

Our work at Schattdecor also included:

Our ability to directly work with both the owner and engineering team was critical to the meet the needs of this facility. By designing a flexible, phased solution, with built in redundancy, we ensured that Schattdecor’s facility could scale efficiently while maintaining consistent production performance.  WBG Service Team continues to be another trusted advisor within our group in providing proactive service & support for the sites mechanical systems.